# Legacy modernization services that replace an aging business system one module at a time

Legacy modernization services move a business system that still works, but can no longer be changed safely, onto a current stack without stopping the company. Goldenroz rebuilds old desktop, Access and early web applications as a TypeScript and React web application on PostgreSQL, module by module, with the data migrated and reconciled at each step. Projects start at $25,000 with a fixed price per phase after a free scoping call, and larger programs run $100,000 and up.

**From $25,000, fixed price per phase**

Updated: 2026-11-14. By Shai Goldenberg.

## What usually goes wrong

- **One person understands it:** The developer who wrote the system has left or is close to retiring, and the business rules live in code nobody else reads.
- **The platform is out of support:** The application depends on a runtime, database version or operating system that no longer receives security patches.
- **Nothing can connect to it:** The old system has no API. Staff export a file and retype numbers into the accounting system, the web store or a customer report.
- **Office-only access:** It runs on desktops inside one building or through a remote desktop session. Field staff and remote managers work from printouts and phone calls.

## What is included

- **System inventory:** We read the code and the database, list every screen, report, scheduled job and integration, and mark which are still used.
- **Business rule extraction:** Pricing rules, status changes and calculations are written down in plain language and confirmed with the people who use them before any new code exists.
- **New data model:** A PostgreSQL schema designed from the rules, not copied from the old tables. Roles and permissions are enforced in the database with Row Level Security.
- **Phased replacement:** One module moves at a time. The old and new systems run side by side with data synced between them until the last module is switched off.
- **Data migration and reconciliation:** Scripted, repeatable imports with counts and totals compared against the old system after every run, so a mismatch is found before cutover.
- **Cutover and handover:** A rehearsed cutover, a rollback plan, user training and documentation. The repository, database and hosting accounts are in your company's name.

## Legacy system modernization: rehost, refactor or rebuild

Application modernization services cover three different jobs. Rehosting moves the same application to newer servers and changes nothing else. Refactoring keeps the application and cleans up the code inside it. Rebuilding writes a new application around the same business rules.

Rehosting is the cheapest and fixes the least. It suits a system that does its job and only needs a supported home. Legacy software modernization by rebuild makes sense when the technology itself blocks you: no browser access, no API, no mobile, no developers left who want to work on it.

Our work is the rebuild case. We do not sell lift-and-shift moves of an unchanged application, and we do not modernize mainframe estates. On the scoping call Shai tells you which of the three your system needs, including when the answer is to leave it alone for another two years.

## How legacy application modernization runs without a big-bang cutover

The safest pattern replaces the system from the edges inward. A new module is built, pointed at live data and used by a small group while the old screens stay available. When the numbers match for an agreed period, the old module is retired. Software reengineering done this way never puts the whole company on untested software in one weekend.

Data is where these projects fail. Old databases hold duplicate customers, free-text fields used as status codes and records that break their own rules. Software migration services that are done properly budget for cleaning this, and for a reconciliation report that finance signs off. Each phase has a fixed scope and price, described under [custom business software development](https://goldenroz.com/business-software-development/) and on the [pricing page](https://goldenroz.com/pricing/).

## What it costs

Every project is split into phases. Each phase has a fixed scope and a fixed price, agreed before work on it starts. Hosting, licences and third-party services are paid directly by you.

- Business system, first phase and smaller systems: From $25,000 (Fixed price per phase)
- Larger systems: $100,000 and up (Web, mobile and several integrations, scoped one phase at a time)
- Maintenance and support: Quoted separately (Agreed after launch, not required)
- Scoping call: $0 (One hour with Shai)
- Code ownership: Yours (Repository in your organization from day one)

## Who it is not for

- Mainframe, COBOL or AS/400 estates. Those need a specialist firm with a large team.
- Lift-and-shift hosting moves where the application itself is not changed.

## Questions buyers ask

### How much do legacy modernization services cost?

At Goldenroz, projects start at $25,000 and larger programs run $100,000 and up. The price is fixed per phase after a free one-hour scoping call. The main cost drivers are the number of modules, the state of the data and how many other systems the old application feeds.

### Should we modernize the legacy system or replace it with a product?

Buy a product when your process is standard and the old system exists only because nothing better was available when it was written. Rebuild when the system encodes rules that set your company apart and no product covers them.

### Can you work on a system with no documentation?

Yes, if we get the source code and a copy of the database. The first phase is reading both and writing down what the system does.

### Which legacy technologies do you take on?

Desktop and early web business applications backed by a relational database or by Access and spreadsheet files are the usual starting point. The target is always the same: TypeScript, React and PostgreSQL. Mainframe and COBOL estates need a specialist firm with a larger team.

### Will staff have to stop work during the migration?

No. The old and new systems run in parallel and modules move one at a time. The final cutover is rehearsed on a copy of production data first and scheduled for a quiet period you choose.

---
Page: https://goldenroz.com/legacy-modernization-services/
Book a free one-hour call: https://calendly.com/daniarozin/daniel-rozin-consultation-1-hour-clone
