# Backup services for business that also cover the production machine nobody can rebuild

Backup services for business usually cover servers, laptops and cloud data. Goldenroz also backs up what those services skip: production-line machines and control computers running any operating system from the 1980s until today, including DOS, early Windows and proprietary controller PCs. The work is a project with full disk images, an offline copy and a restore test on spare hardware or a virtual machine. Projects start at $25,000 at a fixed price per phase, and larger programs run $100,000 and up.

**From $25,000, fixed price per phase**

Updated: 2026-11-14. By Shai Goldenberg.

## What usually goes wrong

- **The line PC nobody can rebuild:** A CNC machine, press or packaging line is driven by a PC whose operating system is no longer sold. The installation disks and the setup notes left with the person who commissioned it.
- **A disk that has run for decades:** The original hard disk is still in service. Drives with the same interface are scarce, and a failure stops the machine until one is found.
- **Backup agents that will not install:** Current backup software does not support the old operating system, so the machine was left off the backup list years ago and stayed off.
- **Settings that live only on the machine:** Recipes, tool tables and calibration values were entered on the shop floor over many years. They exist in one place.

## What is included

- **Machine and computer inventory:** Every control PC, operator panel and engineering workstation is listed with its operating system, disk type, licence keys and what production loses if it fails.
- **Disk images taken offline:** A complete image of each disk, taken by booting from external media or by removing the disk and reading it through an adapter. Nothing is installed on the old system.
- **A spare or virtual copy:** Each image is restored to matching spare hardware kept on the shelf, or to a virtual machine when the control software and its interfaces allow it.
- **Offline and off-site copies:** Images are stored in at least two places with checksums. One copy is disconnected from the network, out of reach of ransomware.
- **Restore test and runbook:** Before handover the spare is started from the image and checked. The steps, the time taken and the person responsible are written down.

## Bare metal backup for machines that cannot run a backup agent

A bare metal backup copies the whole disk, sector by sector: boot record, operating system, drivers, the control application and its data. For a computer from the 1990s this is the method that works, because the software was often installed once from floppy disks and tuned by hand.

Old machines bring old hardware: IDE or SCSI disks, CompactFlash cards and file systems that current tools read only in raw mode. We read the disk outside the machine where that is safer and verify the image against the source.

An image does not capture hardware licence dongles, interface cards or battery-backed memory inside a controller. The inventory lists those parts as separate risks.

## Spare hardware or a virtual machine: where the old PC runs after a failure

Virtualizing the old PC works when its software talks to the machine over a serial port or Ethernet. The system then runs on a current host, and the virtualization platform is chosen with you during the assessment.

It does not work when the control depends on a proprietary card, a parallel-port dongle or exact timing. Those machines need a matching spare PC, restored from the image and tested.

This is legacy system support in a narrow sense: we keep the computer restorable. We do not change the builder's control software, write PLC logic or recalibrate the machine. Old systems that cannot be patched should also be isolated on the network, which is covered under [OT security](https://goldenroz.com/ot-security/).

## Servers, laptops and cloud data in the same design

The same project covers the ordinary estate: servers with recovery targets agreed per system, endpoint backup for laptops and workstations, and cloud mail and files. The full method, including a recovery site, is on the [disaster recovery services](https://goldenroz.com/disaster-recovery-services/) page.

Backup software, storage and spare hardware are bought by you, directly from the vendor you choose.

## What it costs

Every project starts with an assessment. Each phase after it has a fixed scope and price. Hardware, licences and hosting are paid directly by you to the vendor.

- Infrastructure project: From $25,000 (Fixed price per phase, starting with the assessment)
- Larger infrastructure programs: $100,000 and up (Data center migrations and multi-site programs over several phases)
- Hardware, licences and hosting: Paid by you (Bought directly from the vendor or distributor you choose)
- Scoping call: $0 (One hour with Shai)

## Who it is not for

- Workshops with one machine and a budget under $25,000.
- Repair, PLC programming or recalibration of the machine itself. That stays with the machine builder or your integrator.
- A promise that every old system can be virtualized. Some need matching hardware, and we say which after the inventory.

## Questions buyers ask

### What do your backup services include?

An inventory, a design with off-site and offline copies, images of production and legacy computers, backup of servers and endpoints, and a recorded restore test with a runbook.

### Can backup services for business cover a machine that runs DOS or early Windows?

Yes. We back up production-line machines and computers running any operating system from the 1980s until today. The disk is imaged from outside the running system, so the age of the operating system does not limit the backup.

### Does imaging a machine stop production?

The machine's computer is powered down while its disk is read, so the work is planned in a maintenance window or a shift change.

### Do you provide managed backup services after the project?

Yes, as part of a [managed IT services](https://goldenroz.com/managed-it-services/) retainer quoted after an assessment. It covers scheduled checks of backup jobs, repeat images after machine changes and restore tests at an agreed frequency.

### What does a backup project cost?

Projects start at $25,000 at a fixed price per phase, beginning with the inventory. See [pricing](https://goldenroz.com/pricing/).

---
Page: https://goldenroz.com/legacy-system-backup/
Book a free one-hour call: https://calendly.com/daniarozin/daniel-rozin-consultation-1-hour-clone