GoldenrozBook a call

OT security at the IT/OT boundary: segmentation, controlled remote access and backups for the plant network

OT security protects the systems that run physical processes, such as PLCs, SCADA servers and HMIs, from attacks that usually arrive through the office network. Goldenroz works on the IT side and the IT/OT boundary: network segmentation, an industrial DMZ, vendor remote access, identity, and backup of the Windows servers and workstations around the controllers. We do not program PLCs or configure control logic. Projects start at $25,000 at a fixed price per phase, and larger multi-site programs run $100,000 and up.

From $25,000, fixed price per phase

Updated 2026-11-14. By Shai Goldenberg

What usually goes wrong

  • One flat network for office and plant
    Office laptops and controllers share a subnet, so malware that lands through email can reach the production line with no firewall in between.
  • Vendor remote access nobody tracks
    The machine builder left a remote desktop tool or a cellular modem in the cabinet. It is always on and the password has not changed since commissioning.
  • An HMI on an unsupported Windows version
    The operator station runs an operating system the vendor will not let you patch.
  • Production data pulled straight from the controllers
    The ERP or a reporting tool connects directly from the office to the control network.
  • No backup of the engineering workstation
    PLC project files, HMI images and historian data live on one computer in the control room. If it fails, the restart depends on a vendor visit.

What is included

  • Asset and connection inventory
    A list of the servers, workstations, switches and remote links around the control system, and every path between the office and the plant.
  • Segmentation design
    Zones for office, plant supervision and control, with firewall rules that allow only the named flows each zone needs.
  • Industrial DMZ
    A buffer network for historians, patch servers and file transfer, so no connection runs directly from the office to a controller.
  • Controlled vendor access
    Remote access through one gateway with named accounts, multi-factor authentication, time-limited sessions and a log. Unmanaged modems and remote tools are removed.
  • Backup of the Windows layer
    Backups of SCADA servers, historians, engineering workstations and project files, with a restore test run and recorded before handover.
  • Documentation and handover
    Network diagrams, firewall rule sets and runbooks, reviewed with your IT team and your controls engineers or integrator.

ICS security and IT/OT convergence: where the risk enters

Plant networks used to be isolated. IT/OT convergence ended that: the ERP wants production counts, maintenance wants remote diagnostics and a smart factory program adds sensors and cloud analytics. Each connection is a path an attacker can follow.

Most ICS security incidents in manufacturing start in IT. A phishing email or a stolen VPN account opens the office network, and a flat network does the rest. Frameworks such as IEC 62443 and NIST SP 800-82 describe the answer as zones and conduits: group systems by function and control every flow between groups.

That boundary is the subject of our IT infrastructure services, led by Shai with senior infrastructure engineers.

SCADA security and manufacturing cybersecurity without stopping the line

Industrial cybersecurity has a constraint office IT does not: you cannot reboot a line on a Tuesday afternoon. Changes are planned around shutdowns, each with a rollback step, and nothing on the control network is scanned actively without the operators' agreement.

SCADA security in practice means protecting the Windows servers and workstations around the controllers. Where a system cannot be patched, it is isolated: its own zone, only the ports it needs and no internet access. We work with your controls engineers or system integrator, who remain responsible for the controllers and the logic.

OT cybersecurity projects run in phases: assessment, design, a pilot on one line, then the rest in waves. Ongoing administration is available through managed IT services.

How the work runs

  1. Scoping call

    Before the project

    A free one-hour call with Shai about what you run today, what is driving the change and what cannot go down.

  2. Assessment

    First phase

    Inventory, dependency mapping and risk review on site or remotely. You get a written report and a fixed price for the next phase.

  3. Design and plan

    Second phase

    Target architecture, vendor and platform choice, bill of materials, migration waves and the rollback plan. You approve it before anything is bought.

  4. Build and pilot

    Third phase

    The new environment is built and tested, then a small group of low-risk systems moves first to prove the method.

  5. Migration and handover

    Final phases

    The remaining waves move in agreed maintenance windows. The project ends with a restore test, documentation and a session with your team.

What it costs

Every project starts with an assessment. Each phase after it has a fixed scope and price. Hardware, licences and hosting are paid directly by you to the vendor.

See full pricing

  • Infrastructure project
    Fixed price per phase, starting with the assessment
    From $25,000
  • Larger infrastructure programs
    Data center migrations and multi-site programs over several phases
    $100,000 and up
  • Hardware, licences and hosting
    Bought directly from the vendor or distributor you choose
    Paid by you
  • Scoping call
    One hour with Shai
    $0

Who it is not for

  • PLC programming, control logic, safety instrumented systems or SCADA application engineering. That belongs with a controls integrator.
  • Continuous monitoring of the plant network by a staffed security operations center.
  • Certification or formal assessment against IEC 62443 or similar standards.

Who does the work

CTO and technology partner

Shai leads the technology side: business software, SaaS and mobile apps, payments and escrow systems, Postgres security, AI agents built with Claude Code and MCP, and IT and infrastructure projects with senior infrastructure engineers.

Questions buyers ask

What does an OT security project include?

An inventory of systems and connections, a segmentation design, an industrial DMZ, controlled vendor access, backups with a restore test, and documentation. Each phase has a fixed scope and price.

Do you program PLCs or change SCADA configuration?

No. Controllers, control logic, safety systems and SCADA application configuration stay with your controls engineers or integrator. We cover the IT side and the boundary: network, firewalls, identity, remote access and backup.

How much does OT cybersecurity work cost?

Projects start at $25,000 at a fixed price per phase, beginning with an assessment. Multi-site programs run $100,000 and up. Firewalls, switches and licenses are bought by you directly from the vendor.

Are you certified for IEC 62443 or other industrial cybersecurity standards?

No. We design and document technical controls that follow the zone and conduit approach those standards describe. We hold no IEC 62443 certification and no vendor partner status, and we cannot certify your plant.

Will the work interrupt production?

It is planned so it should not. Changes go in during agreed shutdowns, start with a pilot on one line and carry a rollback step.

Guides on this topic

Talk to the person who will do the work

One hour, no sales team. You talk to Shai Goldenberg, the CTO, about your systems or your product, and you leave with a clear next step and a price range.

Or send the details

Book a 1-hour consultationWhatsApp us