A VMware alternative is a virtualization platform, such as Microsoft Hyper-V, Proxmox VE or Nutanix AHV, that replaces vSphere for running virtual machines. Goldenroz assesses your VMware environment, compares staying against the alternatives on licence cost, features and team skills, and runs the migration in waves with a rollback step for each. Projects start at $25,000 at a fixed price per phase, beginning with the assessment, and larger programs run $100,000 and up.

From $25,000, fixed price per phase

Updated 2026-11-14. By Shai Goldenberg

What usually goes wrong

  • A renewal quote far above the last one
    Since Broadcom acquired VMware, licensing moved to subscriptions sold as bundles per core. Many organizations now pay for products in the bundle that they never used.
  • Perpetual licences with no support path
    The licences you bought still run, but support and updates require a subscription. Running unpatched hypervisors is a risk you have to own or remove.
  • Hardware refresh lands the same year
    Hosts and storage are near end of support. Choosing hardware before choosing the hypervisor can lock in the wrong design.
  • The team knows only vSphere
    Administrators have years of vCenter habits. A new platform changes daily operations, and the cost of retraining belongs in the comparison.
  • Tools tied to vSphere
    Backup, replication and monitoring products talk to vSphere interfaces. Each one has to be checked for support on the target platform before any virtual machine moves.

What is included

  • VMware estate assessment
    Hosts, cores, clusters, virtual machines, storage and the features really in use, such as live migration, high availability, vSAN, NSX and site recovery.
  • Licence and cost comparison
    Staying on VMware against each alternative over several years, including subscriptions, hardware, support contracts, tooling changes and staff time.
  • Platform recommendation
    At least two workable options compared on cost and risk, with what you would give up on each. Staying is always one of the options.
  • Pilot cluster
    A small cluster on the target platform running low-risk workloads, to prove performance, backup and operations before any commitment.
  • Migration in waves
    Virtual machines converted and moved in groups, each with a runbook, a maintenance window, checks and a tested rollback. Source machines stay intact until sign-off.
  • Tooling and handover
    Backup, monitoring and recovery reconnected on the new platform, a restore test, documentation and working sessions with your administrators.

VMware alternatives compared: Hyper-V, Proxmox and hyperconverged infrastructure

Hyper-V is part of Windows Server, so organizations that license Windows Server Datacenter for their hosts often already hold the rights to run it. It fits environments that are mostly Windows and have staff who know failover clustering.

Proxmox VE is an open source platform built on KVM, with clustering, live migration and optional built-in storage through Ceph. The software has no licence fee, and its vendor sells support subscriptions. The range of third-party backup and management products that work with it is narrower than for vSphere, although it has grown.

Hyperconverged infrastructure puts compute and storage in the same servers and manages them as one system, removing the separate storage array. Nutanix, VMware vSAN and Proxmox with Ceph are examples. It simplifies operations and scales by adding nodes, but it ties storage growth to compute growth. For some estates the honest result of the comparison is to stay on VMware with fewer cores.

VMware migration, VMware support and Proxmox support: how the work runs

A VMware migration starts with the inventory, not the tooling. Each virtual machine is listed with its operating system, disks, network, dependencies and owner. Conversion changes disk formats and drivers, so every machine is started and checked on the target before its cutover window. The general method is on the IT infrastructure services page.

Vendor support comes from the vendor. VMware support is part of your subscription with Broadcom, and Proxmox support subscriptions are bought from Proxmox. We hold no partner status with VMware, Microsoft, Nutanix or Proxmox, and we resell nothing.

What we provide is engineering: VMware consulting on the decision, the build and the migration as a project, and day-to-day administration of the platform afterward under managed IT services. We have no published migration case studies yet, so the pilot wave is where you test our method at low risk.

How the work runs

  1. Scoping call

    Before the project

    A free one-hour call with Shai about what you run today, what is driving the change and what cannot go down.

  2. Assessment

    First phase

    Inventory, dependency mapping and risk review on site or remotely. You get a written report and a fixed price for the next phase.

  3. Design and plan

    Second phase

    Target architecture, vendor and platform choice, bill of materials, migration waves and the rollback plan. You approve it before anything is bought.

  4. Build and pilot

    Third phase

    The new environment is built and tested, then a small group of low-risk systems moves first to prove the method.

  5. Migration and handover

    Final phases

    The remaining waves move in agreed maintenance windows. The project ends with a restore test, documentation and a session with your team.

What it costs

Every project starts with an assessment. Each phase after it has a fixed scope and price. Hardware, licences and hosting are paid directly by you to the vendor.

See full pricing

  • Infrastructure project
    Fixed price per phase, starting with the assessment
    From $25,000
  • Larger infrastructure programs
    Data center migrations and multi-site programs over several phases
    $100,000 and up
  • Hardware, licences and hosting
    Bought directly from the vendor or distributor you choose
    Paid by you
  • Scoping call
    One hour with Shai
    $0

Who it is not for

  • Buyers who need a certified VMware, Microsoft or Nutanix partner with published migration case studies.
  • Licence negotiation or resale. You deal with the vendor or distributor directly.
  • Environments of a few virtual machines on one host, and budgets under $25,000.

Who does the work

CTO and technology partner

Shai leads the technology side: business software, SaaS and mobile apps, payments and escrow systems, Postgres security, AI agents built with Claude Code and MCP, and IT and infrastructure projects with senior infrastructure engineers.

Questions buyers ask

What is the best VMware alternative?

There is no single answer. Hyper-V tends to fit Windows-heavy environments, Proxmox fits teams comfortable with Linux and open source, and hyperconverged platforms fit organizations replacing storage at the same time. The assessment compares them on your workloads, licence terms and staff skills.

How much does a VMware migration cost?

Projects start at $25,000 at a fixed price per phase, and the first phase is the assessment. Larger estates with several clusters or sites run $100,000 and up. Hardware, licences and vendor support subscriptions are paid by you directly, as set out on pricing.

Should we stay on VMware?

Sometimes, yes. If you depend on features with no close equivalent, or the renewal can be reduced by consolidating onto fewer cores, staying may cost less than moving. We compare both honestly, because we earn nothing from the platform you choose.

Do you provide VMware support or Proxmox support after the project?

We provide administration: patching, capacity, monitoring and incident handling under a managed IT retainer quoted after an assessment. Vendor support for software defects comes from Broadcom or Proxmox under your own subscription.

Is hyperconverged infrastructure a good replacement for a cluster with a storage array?

It can be, when the hosts and the array are both due for replacement and workloads are fairly uniform. It is a weaker fit when storage needs grow much faster than compute, or when a recently bought array has years of life left.

Guides on this topic

Talk to the person who will do the work

One hour, no sales team. You talk to Shai Goldenberg, the CTO, about your systems or your product, and you leave with a clear next step and a price range.

Or send the details

Book a 1-hour consultationWhatsApp us