GoldenrozBook a call

Backup services for business that also cover the production machine nobody can rebuild

Backup services for business usually cover servers, laptops and cloud data. Goldenroz also backs up what those services skip: production-line machines and control computers running any operating system from the 1980s until today, including DOS, early Windows and proprietary controller PCs. The work is a project with full disk images, an offline copy and a restore test on spare hardware or a virtual machine. Projects start at $25,000 at a fixed price per phase, and larger programs run $100,000 and up.

From $25,000, fixed price per phase

Updated 2026-11-14. By Shai Goldenberg

What usually goes wrong

  • The line PC nobody can rebuild
    A CNC machine, press or packaging line is driven by a PC whose operating system is no longer sold. The installation disks and the setup notes left with the person who commissioned it.
  • A disk that has run for decades
    The original hard disk is still in service. Drives with the same interface are scarce, and a failure stops the machine until one is found.
  • Backup agents that will not install
    Current backup software does not support the old operating system, so the machine was left off the backup list years ago and stayed off.
  • Settings that live only on the machine
    Recipes, tool tables and calibration values were entered on the shop floor over many years. They exist in one place.

What is included

  • Machine and computer inventory
    Every control PC, operator panel and engineering workstation is listed with its operating system, disk type, licence keys and what production loses if it fails.
  • Disk images taken offline
    A complete image of each disk, taken by booting from external media or by removing the disk and reading it through an adapter. Nothing is installed on the old system.
  • A spare or virtual copy
    Each image is restored to matching spare hardware kept on the shelf, or to a virtual machine when the control software and its interfaces allow it.
  • Offline and off-site copies
    Images are stored in at least two places with checksums. One copy is disconnected from the network, out of reach of ransomware.
  • Restore test and runbook
    Before handover the spare is started from the image and checked. The steps, the time taken and the person responsible are written down.

Bare metal backup for machines that cannot run a backup agent

A bare metal backup copies the whole disk, sector by sector: boot record, operating system, drivers, the control application and its data. For a computer from the 1990s this is the method that works, because the software was often installed once from floppy disks and tuned by hand.

Old machines bring old hardware: IDE or SCSI disks, CompactFlash cards and file systems that current tools read only in raw mode. We read the disk outside the machine where that is safer and verify the image against the source.

An image does not capture hardware licence dongles, interface cards or battery-backed memory inside a controller. The inventory lists those parts as separate risks.

Spare hardware or a virtual machine: where the old PC runs after a failure

Virtualizing the old PC works when its software talks to the machine over a serial port or Ethernet. The system then runs on a current host, and the virtualization platform is chosen with you during the assessment.

It does not work when the control depends on a proprietary card, a parallel-port dongle or exact timing. Those machines need a matching spare PC, restored from the image and tested.

This is legacy system support in a narrow sense: we keep the computer restorable. We do not change the builder's control software, write PLC logic or recalibrate the machine. Old systems that cannot be patched should also be isolated on the network, which is covered under OT security.

Servers, laptops and cloud data in the same design

The same project covers the ordinary estate: servers with recovery targets agreed per system, endpoint backup for laptops and workstations, and cloud mail and files. The full method, including a recovery site, is on the disaster recovery services page.

Backup software, storage and spare hardware are bought by you, directly from the vendor you choose.

How the work runs

  1. Scoping call

    Before the project

    A free one-hour call with Shai about what you run today, what is driving the change and what cannot go down.

  2. Assessment

    First phase

    Inventory, dependency mapping and risk review on site or remotely. You get a written report and a fixed price for the next phase.

  3. Design and plan

    Second phase

    Target architecture, vendor and platform choice, bill of materials, migration waves and the rollback plan. You approve it before anything is bought.

  4. Build and pilot

    Third phase

    The new environment is built and tested, then a small group of low-risk systems moves first to prove the method.

  5. Migration and handover

    Final phases

    The remaining waves move in agreed maintenance windows. The project ends with a restore test, documentation and a session with your team.

What it costs

Every project starts with an assessment. Each phase after it has a fixed scope and price. Hardware, licences and hosting are paid directly by you to the vendor.

See full pricing

  • Infrastructure project
    Fixed price per phase, starting with the assessment
    From $25,000
  • Larger infrastructure programs
    Data center migrations and multi-site programs over several phases
    $100,000 and up
  • Hardware, licences and hosting
    Bought directly from the vendor or distributor you choose
    Paid by you
  • Scoping call
    One hour with Shai
    $0

Who it is not for

  • Workshops with one machine and a budget under $25,000.
  • Repair, PLC programming or recalibration of the machine itself. That stays with the machine builder or your integrator.
  • A promise that every old system can be virtualized. Some need matching hardware, and we say which after the inventory.

Who does the work

CTO and technology partner

Shai leads the technology side: business software, SaaS and mobile apps, payments and escrow systems, Postgres security, AI agents built with Claude Code and MCP, and IT and infrastructure projects with senior infrastructure engineers.

Questions buyers ask

What do your backup services include?

An inventory, a design with off-site and offline copies, images of production and legacy computers, backup of servers and endpoints, and a recorded restore test with a runbook.

Can backup services for business cover a machine that runs DOS or early Windows?

Yes. We back up production-line machines and computers running any operating system from the 1980s until today. The disk is imaged from outside the running system, so the age of the operating system does not limit the backup.

Does imaging a machine stop production?

The machine's computer is powered down while its disk is read, so the work is planned in a maintenance window or a shift change.

Do you provide managed backup services after the project?

Yes, as part of a managed IT services retainer quoted after an assessment. It covers scheduled checks of backup jobs, repeat images after machine changes and restore tests at an agreed frequency.

What does a backup project cost?

Projects start at $25,000 at a fixed price per phase, beginning with the inventory. See pricing.

Guides on this topic

Talk to the person who will do the work

One hour, no sales team. You talk to Shai Goldenberg, the CTO, about your systems or your product, and you leave with a clear next step and a price range.

Or send the details

Book a 1-hour consultationWhatsApp us